The Municipality of Thames Centre will be conducting its annual road re-paving and concrete repair work this summer. Our roads are nearing the end of their lifecycle and require this maintenance to ensure continued safety and functionality. 

Work Schedule and Locations

J-AAR will be on site to start work on the following streets as part of our summer Road Resurfacing:

Dorchester

  • Melvin Drive
  • Eric Drive
  • Elizabeth Drive
  • Queen Street
  • Ann Street
  • Elizabeth Street
  • Minnie Street Railroad Crossing
  • Sherwood Crescent
  • Sherwood Place
  • Huntington Crescent
  • Mitchell Avenue
  • Mitchell Court
  • Scarlett Circle
  • Chittick Crescent from Byron Ave. South

Nilestown

  • Neely Court
  • Wright Street

Putnam

  • Couch Road

The project will commence with concrete works, followed by the milling of existing asphalt, and then re-paving. If sidewalks are present at your location, sidewalk repairs and curb replacements will occur simultaneously.

 

Project Scope

Concrete Repairs

  • Replacement of deficient concrete curb sections
  • Catch Basin lid replacements
  • Restoration of boulevards or driveway aprons (where necessary)

Road Resurfacing

  • Milling of existing asphalt
  • Repairing any soft spots in the granular base (if applicable)
  • Replacement of existing maintenance hole lids
  • Layering new asphalt surface

 

Impact on Residents

Road Access/Driveway Access and Parking

During the construction period, access will be maintained as much as possible. Access to your driveway may be limited if a section of the curb/ or sidewalk is being replaced in front of it. To give the new concrete a chance to properly cure, we request residents refrain from driving over the new sections of concrete for 3-5 days. While crews are on site, we kindly request you to avoid parking on the road during work hours (7 am–7 pm).

Noise and Dust

Please be aware that there will be some noise and dust associated with the construction activities. We apologize for any inconvenience this may cause and appreciate your understanding and patience as we work to complete these improvements efficiently.

Garbage and Recycling Collection

There will be no disruptions to Garbage & Recycling Collection. Please continue to follow your regular schedule.

 

Map Locations

dorchester map showing where the hot mix paving will happennilestown hot mix location spots on mapputnam location hot mix paving map

 

 

Questions

Jake McKillop, Transportation Superintendent
jmckillop@thamescentre.on.ca 
Tel: 519.268.7334 ext. 251